|
Crnogorski Elektroprenosni Sistem AD (MNSE: (PREN )) (CGES; former name Prenos AD; meaning: Montenegrin Electrical Transmission System) is an electric power transmission system operator located in Podgorica, Montenegro. It is a member of European Network of Transmission System Operators for Electricity. AD stands for Akcionersko Drustvo, or Joint Stock Company. In 2009, the company was split from EPCG and partly privatized, with 43.7% stake in the company acquired by the Italian utility company A2A. 22% stake is owned by Italian electricity transmission company Terna.〔 〕 CGES and Terna are planning to build a 1,000 MW submarine cable between Tivat and Pescara.〔〔 〕 The cable to be operational by 2015. The European Bank for Reconstruction and Development is preparing a €65 million syndicated loan for the company. The loan would be used for the construction of a new substation at Lastva, and a new line from Lastva to Pljevlja to be connected to the Italy–Montenegro interconnector.〔 〕〔 〕 ==See also== *Energy in Montenegro 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Crnogorski Elektroprenosni Sistem」の詳細全文を読む スポンサード リンク
|